| Sl.No. |
Reported Date |
Location |
Complaint Description |
Status |
View |
| 1 |
1/1/1900 |
|
|
Registered |
View |
| 2 |
1/1/1900 |
|
|
Registered |
View |
| 3 |
1/1/1900 |
|
|
Registered |
View |
| 4 |
1/1/1900 |
|
|
Registered |
View |
| 5 |
1/1/1900 |
|
|
Registered |
View |
| 6 |
1/1/1900 |
|
|
Registered |
View |
| 7 |
1/1/1900 |
|
|
Registered |
View |
| 8 |
1/1/1900 |
|
|
Registered |
View |
| 9 |
1/1/1900 |
|
|
Registered |
View |
| 10 |
1/1/1900 |
|
|
Registered |
View |
| 11 |
1/1/1900 |
|
|
Registered |
View |
| 12 |
1/1/1900 |
|
|
Registered |
View |
| 13 |
1/1/1900 |
|
|
Registered |
View |
| 14 |
1/1/1900 |
|
|
Registered |
View |
| 15 |
1/1/1900 |
|
|
Registered |
View |
| 16 |
1/1/1900 |
|
|
Registered |
View |
| 17 |
1/1/1900 |
|
|
Registered |
View |
| 18 |
1/1/1900 |
|
|
Registered |
View |
| 19 |
1/1/1900 |
|
|
Registered |
View |
| 20 |
1/1/1900 |
|
|
Registered |
View |
| 21 |
1/1/1900 |
|
|
Registered |
View |
| 22 |
1/1/1900 |
|
|
Registered |
View |
| 23 |
1/1/1900 |
|
|
Registered |
View |
| 24 |
1/1/1900 |
|
|
Registered |
View |
| 25 |
1/1/1900 |
|
|
Registered |
View |
| 26 |
1/1/1900 |
|
|
Registered |
View |
| 27 |
1/1/1900 |
|
|
Registered |
View |
| 28 |
1/1/1900 |
|
|
Registered |
View |
| 29 |
1/4/2005 |
Hungund Police Quarters |
The matter regarding drainage |
Complaint Resolved |
View |
| 30 |
1/5/2005 |
Bagalkote |
Unsatisfactory quality of work done in the newly constructed Mobile Station, Bagalkote.
Rain water harvesting is not done,
Structural crack observed,
Tiles, joints. |
Complaint Forwarded |
View |
| 31 |
1/10/2005 |
Bagalkote |
Matter connected to fans inastalled in DPO, Bagalkote. |
Complaint Forwarded |
View |
| 32 |
1/10/2005 |
Bangalore |
Cracked wall/ceiling and leakage of water. |
Complaint Forwarded |
View |
| 33 |
1/22/2005 |
Bangalore |
Construction of Toilets,
Construction of shelter for petrol bunk,
Service Station,
Repair of Pump House.
|
Complaint Forwarded |
View |
| 34 |
2/2/2005 |
Hassan |
Quality of work done in the construction of quarters at Kushalnagar and Dy.SP and CPI Offices not satisfactory and number of complaints observed. |
Complaint Forwarded |
View |
| 35 |
2/5/2005 |
Bagalkote |
About the installation of a fan in Mahalingapura Police Station. |
Complaint Forwarded |
View |
| 36 |
1/7/2006 |
Bangalore |
UPS that are purchased are not giving full backup support at the time of power failure. |
Details Required |
View |
| 37 |
1/14/2006 |
Madiwala |
water is leaking from madiwala police satation building sanitation pipe. |
Details Required |
View |
| 38 |
2/2/2006 |
Mysore |
the building is not constructed accroding to plan. |
Complaint Resolved |
View |
| 39 |
6/11/2006 |
MSR nagar |
Underground drainage being clogged, repairs requested. |
No Action Required |
View |
| 40 |
6/16/2006 |
Mysore Road, Sirsi Circle |
Roads in CAR Police Qts are in pathetic condition.
TAR raod was supposed to be laid here..but the authorities have failed to complete their work.
Its been more than fifteen year now and they have not turned up to lay the TAR. Right now its just a mud raod with stones,pathholes,etc.. |
No Action Required |
View |
| 41 |
6/29/2006 |
Hadagali |
The Home Minister of Karnataka pointed out that the newly constructed CPI office at Hadagali had a leaky roof that needs to be attended to at once. The contractor who built this may be asked to rectify the defect as the office is under warranty period. Action needs to be taken to fix responsibility for the lapse against the engineers at site for sloppy supervision. |
Registered |
View |
| 42 |
7/6/2006 |
Konaje, Mangalore |
Regarding substandard construction of Qtrs for Konaje Police Station staff. |
Complaint Resolved |
View |
| 43 |
7/6/2006 |
Belthangadi, DK Dist. |
Regarding Substandard construction of Beltangadi PS staff Qtrs. |
Complaint Forwarded |
View |
| 44 |
7/6/2006 |
Hassan |
To carry out repairs Defects to Gonikoppa and Ponnampet Police stations |
Complaint Forwarded |
View |
| 45 |
7/10/2006 |
Juvenile Offences Dharwad |
The proposed modernisation of Haveri district prisons building under perspective plan |
Complaint Forwarded |
View |
| 46 |
7/11/2006 |
Haveri |
Regading construction of Prison at Haveri. |
Complaint Forwarded |
View |
| 47 |
7/18/2006 |
Nandini layout, Bangalore |
Regarding Roof leaking of Nandini layout PS. |
Queued For Processing |
View |
| 48 |
7/21/2006 |
Bangalore |
My Complaint is this that the position of street in my area is too ill built to explain it is inviting an accident every time. Please have a look on the problem.
|
No Action Required |
View |
| 49 |
7/24/2006 |
KGF |
Regading fixing of submercible pump to the borewell and making provision for RWH for newly built DPO building |
Registered |
View |
| 50 |
7/25/2006 |
Mulbagil |
Regarding repair to Police Qtrs. |
Complaint Forwarded |
View |
| 51 |
7/25/2006 |
Kanakapura |
Regarding leakage in the roofs of the newly built Qtrs. |
Complaint Forwarded |
View |
| 52 |
7/26/2006 |
FingerPrint Bureau Madiwala Bangalore |
Incomplete works in respect of civil, electrical lab coupling works - to be completed. |
Complaint Forwarded |
View |
| 53 |
8/1/2006 |
Hariharapura and Koppa |
Regarding roof leaking of Hariharapura P.S and C.P.I office and Koppa P.S |
Complaint Resolved |
View |
| 54 |
9/26/2006 |
Bidar |
Lack of water supply, Electric Supply and incomplete wiring work to be completed. |
Complaint Forwarded |
View |
| 55 |
11/8/2006 |
Bangalore |
You are not attending to the complaint. The last few months complaints are simply registered but no action seems to be taken. Will you pl update the action taken by you on the registered complaints. RSK |
Registered |
View |
| 56 |
11/27/2006 |
1 SI Qtrs. near Shanivarsante Police Stn. |
The building constructed has bad/defective workmanship, materials.Hence repairs needed. |
Complaint Forwarded |
View |
| 57 |
1/22/2007 |
Madanahipparagi Basavakalyana |
Complained received from Sri B.R.Patil, MLA as followsk:-
1. Police Station at Madanahipparagi is still not yet completed since it is Central Govt. Scheme.
2. Police Station constructed at Madanahipparagi in place of Basavakalyana
3. A compound has to be constructed at Aland Police Station Area which is 2 Acres already encroached upon
4. Uncompleted Police Station at Nimbarga has to be hand over to the Police Department.
|
Registered |
View |
| 58 |
2/7/2007 |
Hubli-Dharwad |
Regarding construction of 60 quarters for police personel at Unkal, Hubli and 6 SI quarters at Dharwad is not yet completed and the contractor is not doing his work sincerely. Hence necessary instructions may please be given to the constructor to take up the work fastly. |
Registered |
View |
| 59 |
2/7/2007 |
Hubli-Dharwad |
White Washing of the building of the office of the COP, Hubli-Dharwad. Since the building is constructed during the year 2004, It is badly required painting works and some of the minor repairs pertaining to building. Necessary instructions may please be given to concern authorities to take up the work immediately under intimation. |
Registered |
View |
| 60 |
2/21/2007 |
Test |
Test |
Registered |
View |
| 61 |
3/9/2007 |
Bannergatta |
We NRI have bought around 110 plots in Nobel Nagar-Bannergatta, Kottigare village. A brick factory guy has set up a brick factory on our land. At present he is taking soil from our land. He does not allow any of us to approach our site. We want him to stop extracting soil from our land and remove his brick factory. I had lodged complaint in year 2000 with Bannergatta police station. But the brick factory guy is not bothered about the complaint. We NRI can not visit India very often neither can opt for a reprehensible act. We need your help to stop illegal extraction of soil from the land.
Further details can be obtained from Mr Sashibhushan based in Bangalore. He can be contacted on Phone OFC.-22276932,Res-22239124 |
Registered |
View |
| 62 |
5/5/2007 |
G.B.PALYA |
The residence of GBPALYA which is on Hosur Main Road are facing many civic issues. Mainly the roads (CLAY ROADS) are a major threat to the civilians of this area. There are couple of big schools like "MAHA HIGH SCHOOL" , "ST MARYS SCHOOL".. where i daily see kids facing problems during rain seasons. I kindly request the authorities inchare to look into this and help the people of GBPALYA by providing a good road facility. I appreciate if you could start of work imm before summer ends.
Thanks for your co-operation
|
Registered |
View |
| 63 |
5/7/2007 |
Jyothinagar, Mysore |
The construction of 22 subordi-nate quarters started from 28-12-06 to have been completed on the 27-12-07, but has not been completed even after lapse of a further four months. The contractor has not attended even one review meeting in the complainants office.(Ref CB/CP/2006-2007,dt 23-04-07). |
Registered |
View |
| 64 |
5/8/2007 |
Chamarajanagar |
The DPO building was handed over to the Police Department, Chamarajanagar, on the 27-05-04. But after three years/intervening period rain water has leaked, all lighting equipment are malfunctioning. Also, the white-washing/painting on the outside walls,inside walls and on the doors and windows have faded and give bad appearance. Request was made vide CHANA/KATTADA/33/98/99, dt. 06-07-06, to repaid cracks to stop rainwater leaking, rapair all lighting fittings and get inside walls, outside walls and doors & windows. But, even after one year not attended. |
Registered |
View |
| 65 |
5/11/2007 |
BTM Layout, 11th Main 1st Stage |
There is a costruction going since past one year, It have reached to fifth floor. This kind of construction are taking place and some goverment official might be knowing that. Could any body please take action against this construction? |
Registered |
View |
| 66 |
5/16/2007 |
Chickmagalur |
The construction of 94 PC and 12 SI quarters started about one year ago is incomplete and hence allottment of quarters to police personnel is delayed. The construction may kindly be taken up and completed speedily.(Let BC.5/2007 dt: 5-5-2007; (2) DO let dt: 15-2-2007 and (3) reminder dated 23-4-2007) |
Registered |
View |
| 67 |
7/20/2007 |
RamaSwamy Palya |
Drainage system is not correct in Veerabhadrappa Road. During rains water floods in all houses more than knee level. Very difficult to survive. Possiblity of electric shocks due to overflow of drainage outside and flowing into houses. Please look into this asap. |
Registered |
View |
| 68 |
7/25/2007 |
Alnavara, Dharwad Dist |
Cracks have been reported on the inner and outer walls of the newly constructed 6 PC quarters which have been completed and which come under the PSI, Alnavara Police Station, Dharwad Dist. It is requested by SP, Dharwad, that the repairs be carried out and then only be handed over.
|
Registered |
View |
| 69 |
7/25/2007 |
Alnavara, Dharwad Dist |
The two inside and outside walls in the 1 SI and 6 PC quarters have developed cracks and it is requested by the SP, Dharwar Dist, that they be repaired and then only be handed over to the PSI, Alnavara, Dharwar Dist. |
Registered |
View |
| 70 |
7/25/2007 |
Munirabad, |
The Munirabad Police Station constructed in 2004 has started from the ceiling and there is dampness on the wall, as reported by DSP, Koppal, vide his let 15-6-07.
Also, the WC constructed on the first floor of the police station has not been constructed properly. |
Registered |
View |
| 71 |
7/25/2007 |
JP Nagar |
I am unable to register my complaints in your website. Whatever complaints are registered,do not show their latest status of disposal. Will you please look into this and set right. When I go to the discussion link in your website, I see lot of junk there. How can I lodge my views on the discussion forum when the whole place is full of junk? RSK
|
Registered |
View |
| 72 |
7/25/2007 |
Bangalore |
I am unable to register my complaints in your website. Whatever complaints are registered,do not show their latest status of disposal. Will you please look into this and set right. When I go to the discussion link in your website, I see lot of junk there. How can I lodge my views on the discussion forum when the whole place is full of junk? RSK |
Registered |
View |
| 73 |
7/25/2007 |
Raichur |
Sh Basavarajappa, a Centering Contractor, Raichur, has approached KSPHC with a request to instruct one of our contractors, Sri G G Bhat, to arrange to make payment of Rs. 1,49,893/- against centering material supplied by him earlier for one the works undertaken by Sri G G Bhat.
|
Registered |
View |
| 74 |
7/25/2007 |
Hoskote Police Station and Quarters constructed for staff of this station |
I. 1. Some walls of the recently constructed Hosakote Police Station
constructed by Engineers and Engineers, Bangalore, Contractors, have developed cracks, resulting in rain water seeping in; 2. low quality steel windows used and so not able to close them; 3. the tiles used for flooring have come loose; 4. besides, the stone slab used to cover the pit outside the police station has broken, causing foul smell.
II. 1. The newly constructed quarters for the staff of Hoskote Police Station, have developed cracks, causing seeping in of rain water; 2. Doors used for main doors, inside doors, bathroom doors do not have latches/proper fittings,resulting in not being able to bolt the doors from inside;
3. water collects on the stairs and seeps into nearby walls. |
Registered |
View |
| 75 |
7/26/2007 |
Rural Police Station, Tumkur (handed over on 13-10-2005) |
1. There are cracks in several places in the walls of the Rural Police Station, Tumkur,
2. Besides, the ceiling in the computed room and the rest room causing rain water to seep in even during light rains.
Request is made to ask the concerned contractor to effect necessary repairs. |
Registered |
View |
| 76 |
7/26/2007 |
8 quarters built for staff of Maski Police Station |
1.The contractor awarded the contract for the construction of the 8 quarters for staff of the Maski Police Station, stationed in Andhra Pradesh, does not visit the project
2. and has not appointed any engineer or supervisor to supervise the works,
3. no curing is being done for the construction,
4. also no water sump is constructed for use during the construction, bad quality cement and workmanship is being used.
Request is for effective supervision to ensure quality construction. |
Registered |
View |
| 77 |
7/26/2007 |
8 quarters built for staff of Maski Police Station |
1.The contractor awarded the contract for the construction of the 8 quarters for staff of the Maski Police Station, stationed in Andhra Pradesh, does not visit the project
2. and has not appointed any engineer or supervisor to supervise the works,
3. no curing is being done for the construction,
4. also no water sump is constructed for use during the construction, bad quality cement and workmanship is being used.
Request is for effective supervision to ensure quality construction. |
Registered |
View |
| 78 |
7/26/2007 |
Construction works being executed in Kodagu Dist., |
1. The construction of quarters and police stations in Kodagu Dist, especially Madikeri and Bagamandala are proceeding slowly,
2. The quality of work is also not satisfactory, photos sent.
Request is made to ensure timely completion of all projects in Kodagu Dist. |
Registered |
View |
| 79 |
7/26/2007 |
Quarters constructed for officers and staff of Police Training School, Khanapur |
Many of the roofs of thequarters constructed for the officers and the staff of the Police Straining School, Khanapur, leak during rainy season.Let dt 9-5-03,8-7-=03,27-9-03 and 4-6-07 have been addressed in this regard.
Request is made to arrange to get the defects repaired through the concerned contractor. |
Registered |
View |
| 80 |
7/26/2007 |
Dist Police Office, Gadag |
1. The earthing used in the Building is defective, causing short-circuit / disruption of work in the computer centre. The UPS has burnt out due to short-circuit.
2.Rain water is seeping into the computer training centre and damaging the files and UPSs.
Request is for arranging to repair the cracks in the walls to prevent rain water coming in and also to repair the earthing cables etc. |
Registered |
View |
| 81 |
7/26/2007 |
Dakshina Kannada Dist Home Guards Building, Mangalore |
The newly constructed Building for the Home Guards at Mangalore has started leaking after light rains. The CD and photos have been submitted to DGP, Home Guards.
Request is made to instruct the concerned conntractor to effect necessary repairs to the building. |
Registered |
View |
| 82 |
7/26/2007 |
Wireless Repeater Centre, Harti |
The works being executed in Wireless Repeater Centre in Harti, have several defects,which have been communicated to AEE, Hubli,vide letters dt 23-3-07 and 4-7-07, yet they have not been set right.
Request is made to instruct him to arrange to carry out the neccy repairs and to send report to SP, Gadag. |
Complaint Resolved |
View |
| 83 |
7/26/2007 |
Bellary, Moka, Hatcholli,Tekkaalakota; Sirigeri,Siruguppa;Hospet;Kottur;Kampli;Kudligi. |
In 10 locations of Bellary District where construction work is in progress, the quality of work is not good, walls have developed cracks and curing has not beed done satisfactorily.
Hence, request has been made to instruct KSPHC engineers to ensure that good quality of work is done. |
Registered |
View |
| 84 |
7/27/2007 |
Karnataka Police Academy Guest House, Mysore |
The Guest House of the Karnataka Police Academy, Mysore has been completed in all respects over 4 months ago, yet has not been handed over due to non connection of water supply. A bore well has been dug and hence water connection could be given to the building in just two days.
Request is made to instruct the concerned to hand over the building in next 10 days. |
Registered |
View |
| 85 |
7/27/2007 |
13 PC quarters constructed in B. Kanabur, Survey No. 213, |
The under ground cables used in the project for construction of 13 PC quarters constructed 3 years ago has burnt out resulting in disruption of electric supply. JE, MESCOM, Balehonnur has stated in writting vide his letter dated 10.05.07 that danger to life of people of the locality is feared, as a result of defective / burnt out under ground electric cables.
Request is made to instruct the concerned to get the defective cables replaced. |
Registered |
View |
| 86 |
8/24/2007 |
Indi, Bijapur |
The constraction of 1si qtrs at Indi in Bijapur District has been completed nealy one year back. The bill is still pending. The contractor is friquently enquring with AEE, EE and AS3 but to no avail. He requests that his bill be settled early.
IP ADDRESS : 59.96.202.129 |
Registered |
View |
| 87 |
11/6/2007 |
Bangalore |
We have submitted so many letters to you by which we have given you the fact & figures about the subject case and the same has been proved by the documents provided to us under RTI. We again request you to investigate this matter and do not go against the tender norms and pre qualification criteria while further processing of the case for issue of any supply order.
For, Jyotech Engg. & Mktg Consultants |
Registered |
View |
| 88 |
11/6/2007 |
Bangalore |
We have submitted so many letters to you by which we have given you the fact & figures about the subject case and the same has been proved by the documents provided to us under RTI. We again request you to investigate this matter and do not go against the tender norms and pre qualification criteria while further processing of the case for issue of any supply order. For, Jyotech Engg. & Mktg Consultants |
Registered |
View |
| 89 |
11/13/2007 |
Malleswaram |
There is a cellphone tower being consttructed at 22, 7th Main, Malleswaram ( entrance from conservancy road) by Mr. Ashok Kumar on top of his terrace. There is safety adn health issue to neighbours - radiation effect from the tower which could cause cancer and other genetic problems and fire hazard to neighbours due to lack of space around the building for proper earthing or precautions. |
Registered |
View |
| 90 |
12/11/2007 |
blore |
testing123... |
Registered |
View |
| 91 |
1/19/2010 |
Bangalore |
I lost my mobile phone at Singasandra while travelling in BMTC bus from Bommanahalli to Electroniccity.The model number is 5130C-xpresmusic and its NOKIA make . |
Registered |
View |
| 92 |
11/30/2010 |
Bangalore |
Dear Sir/Mam,
I was staying in Bangalore and came back to Delhi on 30th November 2010 due to domestic violence, physically tortured and compelled to leave house.
Thanks and Regards
Neeti Duggal
9916102467
9818825617 |
Registered |
View |
| 93 |
5/22/2011 |
Agaram |
My name is chitra, I am getting call from this number 8123792396 daily. He talks rubbish. Please take action |
Registered |
View |
| 94 |
5/22/2011 |
Agaram |
My name is chitra, I am getting call from this number 8123792396 daily. He talks rubbish. Please take action |
Registered |
View |
| 95 |
5/22/2011 |
Agaram |
My name is chitra, I am getting call from this number 8123792396 daily. He talks rubbish. Please take action |
Registered |
View |
| 96 |
12/19/2011 |
Mangalore |
Hi Sir,
I had parked my car VW-Polo along with my friends car VW-Vento infront of our church.
Place: Nandigudda near Marnamikatta Bus Stop.
It was around 8 o-clock in the evening after our prayers, when we came near our cars we found that the front logos of our cars were stolen.
My car VW polo is just two days old. I am extremely dissapointed with the theft.
Kindly, bring an end to such robbery as its causing too much worry among Car-Owners. |
Registered |
View |
| 97 |
12/19/2011 |
Mangalore |
Hi Sir,
I had parked my car VW-Polo along with my friends car VW-Vento infront of our church.
Place: Nandigudda near Marnamikatta Bus Stop.
It was around 8 o clock in the evening after our prayers, when we came near our cars we found that the front logos of our cars were stolen.
My car VW polo is just two days old. I am extremely dissapointed with the theft.
Kindly, bring an end to such robbery as its causing too much worry among Car-Owners. |
Registered |
View |
| 98 |
12/19/2011 |
Mangalore |
Hi Sir,
I had parked my car VW-Polo along with my friends car VW-Vento infront of our church.
Place, Nandigudda near Marnamikatta Bus Stop.
It was around 8 o clock in the evening after our prayers, when we came near our cars we found that the front logos of our cars were stolen.
My car VW polo is just two days old. I am extremely dissapointed with the theft.
Kindly, bring an end to such robbery as its causing too much worry among Car-Owners. |
Registered |
View |
| 99 |
12/19/2011 |
Mangalore |
Hi Sir,
I had parked my car VW Polo along with my friends car VW Vento infront of our church.
Place, Nandigudda near Marnamikatta Bus Stop.
It was around 8 o clock in the evening after our prayers, when we came near our cars we found that the front logos of our cars were stolen.
My car VW polo is just two days old. I am extremely dissapointed with the theft.
Kindly, help us nab the theives. As it is causing too much worry among Car-Owners. |
Registered |
View |
| 100 |
12/19/2011 |
Mangalore |
Hi Sir
I had parked my car VW Polo along with my friends car VW Vento infront of our church.
Place is Nandigudda near Marnamikatta Bus Stop
It was around 8 o clock in the evening after our prayers when we came near our cars we found that the front logos of our cars were stolen
My car VW polo is just two days old I am extremely dissapointed with the theft
Kindly, help us nab the theives. As it is causing too much worry among Car-Owners. |
Registered |
View |
| 101 |
12/19/2011 |
Mangalore |
Hi Sir
I had parked my car VW Polo along with my friends car VW Vento infront of our church.
Place is Nandigudda near Marnamikatta Bus Stop
It was around 8 o clock in the evening after our prayers when we came near our cars we found that the front logos of our cars were stolen
My car VW polo is just two days old I am extremely dissapointed with the theft
Kindly, help us nab the theives. As it is causing too much worry among Car-Owners |
Registered |
View |
| 102 |
12/19/2011 |
Mangalore |
Hi Sir,
I had parked my car VW Polo along with my friends car VW Vento infront of our church.
Place, Nandigudda near Marnamikatta Bus Stop.
It was around 8 o clock in the evening after our prayers, when we came near our cars we found that the front logos of our cars were stolen.
My car VW polo is just two days old. I am extremely dissapointed with the theft.
Kindly, bring an end to such robbery as its causing too much worry among Car-Owners. |
Registered |
View |
| 103 |
1/31/2012 |
Signal of Old Madras Rd and CV Raman Nagar |
While at this signal, one man pretended he got hurt and knocked on my window to roll it down, while a second man showed up at the driver window to move the car because of traffic.
While my window was rolled down, they stole my mobile phone.
Phone details: Samsung Galaxy S2 -I9100
IMEI: 3585370490442101 |
Registered |
View |
| 104 |
1/31/2012 |
Old Madras Rd. and CV Raman Nagar Signal |
While at signal one man pretended to be hurt and asked to roll down wondow on passenger side. While window was rolled down, second man came on the driver window knocking to move forward due to traffic. While this happened the first man stole my mobile phone.
Phone Details:
Samsung S2 Galaxy - GT-I9100
IMEI: 3585370490442101 |
Registered |
View |